Part 9.25.4: NBC 9.25.4: Vapor Barrier Standards
Sarah's Expert Insight
NBC Compliance Specialist • empcontracting.ca Inc.
"Part 9.25.4 (Vapor Barrier) of the National Building Code establishes foundational requirements for NBC 9.25.4: Vapor Barrier Standards. At empcontracting.ca Inc., we engineer every custom build and new customizable, full home build completed on site building construction package to meet or exceed these provisions."
9.25.4.1. Required Vapor Barrier. A vapor barrier shall be provided to prevent the condensation of moisture within the building envelope.
9.25.4.2. Permeance. The vapor barrier shall have a sufficiently low permeance to limit the diffusion of water vapor into the assembly.
9.25.4.3. Installation. The vapor barrier shall be installed on the warm side of the insulation, except as otherwise permitted.
empcontracting.ca Inc. Mastery: We utilize 'Smart Vapor Retarders' that adapt their permeance to the humidity conditions, protecting the assembly year-round.
Disclaimer: This technical summary is provided for educational and planning reference by empcontracting.ca Inc. Every new customizable, full home build completed on site building construction package (excluding lots and real estate) is engineered to comply with NBC and applicable provincial codes.