NBC Official Compliance Standard

Part 9.25: NBC 9.25: Heat, Air and Moisture Transfer Control

S

Sarah's Expert Insight

NBC Compliance Specialist • empcontracting.ca Inc.

"Part 9.25 (Environmental Separation) of the National Building Code establishes foundational requirements for NBC 9.25: Heat, Air and Moisture Transfer Control. At empcontracting.ca Inc., we engineer every custom build and new customizable, full home build completed on site building construction package to meet or exceed these provisions."

9.25.1.1. Scope. This Section applies to the control of heat, air, and moisture transfer through the building envelope.

9.25.2.1. Thermal Insulation. Insulation shall be installed to provide a continuous thermal barrier and minimize thermal bridging.

9.25.3.1. Air Barrier System. A continuous air barrier system shall be provided to minimize air leakage through the building envelope.

empcontracting.ca Inc. Mastery: We utilize advanced blower door testing and high-performance air sealing techniques to masterfully optimize your home's envelope.

Disclaimer: This technical summary is provided for educational and planning reference by empcontracting.ca Inc. Every new customizable, full home build completed on site building construction package (excluding lots and real estate) is engineered to comply with NBC and applicable provincial codes.

Custom Concepts — Full Build Home Packages (Interiors & Exteriors) Completed by Us or for Qualified Professionals Custom Concepts for Full Build Home Packages in Canada • Contact Us for International Build Package Fulfillment (Excluding Lots & Real Estate)