Part 8: Division B - Part 8: Safety Measures at Construction and Demolition Sites
Sarah's Expert Insight
NBC Compliance Specialist • empcontracting.ca Inc.
"Part 8 (Safety Measures at Construction and Demolition Sites) of the National Building Code establishes foundational requirements for Division B - Part 8: Safety Measures at Construction and Demolition Sites. At empcontracting.ca Inc., we engineer every custom build and new customizable, full home build completed on site building construction package to meet or exceed these provisions."
8.1.1.1. Scope. The scope of this Part shall be as described in Subsection 1.3.3. of Division A.
8.1.2.1. Protection of the Public. Safe passage shall be provided for the public past a construction or demolition site.
Disclaimer: This technical summary is provided for educational and planning reference by empcontracting.ca Inc. Every new customizable, full home build completed on site building construction package (excluding lots and real estate) is engineered to comply with NBC and applicable provincial codes.