Part 9.25: NBC 9.25: Heat Transfer, Air Leakage and Condensation Control
Sarah's Expert Insight
NBC Compliance Specialist • empcontracting.ca Inc.
"Part 9.25 (Heat Transfer and Air Leakage) of the National Building Code establishes foundational requirements for NBC 9.25: Heat Transfer, Air Leakage and Condensation Control. At empcontracting.ca Inc., we engineer every custom build and new customizable, full home build completed on site building construction package to meet or exceed these provisions."
9.25.1.1. Scope. This Section applies to the control of heat transfer, air leakage, and condensation in the building envelope.
9.25.2.1. Thermal Insulation. Insulation shall be installed to provide a continuous thermal barrier and minimize thermal bridging.
9.25.3.1. Air Barrier Systems. A continuous air barrier system shall be provided to prevent uncontrolled air leakage through the building envelope.
empcontracting.ca Inc. Strategy: We utilize high-performance vapor-permeable air barriers to ensure long-term durability and energy efficiency.
Disclaimer: This technical summary is provided for educational and planning reference by empcontracting.ca Inc. Every new customizable, full home build completed on site building construction package (excluding lots and real estate) is engineered to comply with NBC and applicable provincial codes.