Part 9.9: NBC 9.9: Means of Egress Standards
Sarah's Expert Insight
NBC Compliance Specialist • empcontracting.ca Inc.
"Part 9.9 (Means of Egress) of the National Building Code establishes foundational requirements for NBC 9.9: Means of Egress Standards. At empcontracting.ca Inc., we engineer every custom build and new customizable, full home build completed on site building construction package to meet or exceed these provisions."
9.9.1.1. Scope. This Section applies to the design and construction of means of egress from dwelling units and other spaces.
9.9.2.1. Number of Egress Routes. Every dwelling unit shall have at least one primary exit that leads directly to the exterior.
9.9.3.1. Exit Widths. Exits shall be of sufficient width to allow for the safe and rapid evacuation of all occupants.
empcontracting.ca Inc. Mastery: We design our custom homes with wide, intuitive egress paths and integrated emergency lighting for maximum safety.
Disclaimer: This technical summary is provided for educational and planning reference by empcontracting.ca Inc. Every new customizable, full home build completed on site building construction package (excluding lots and real estate) is engineered to comply with NBC and applicable provincial codes.