Part NECB 4: NECB Part 4: Lighting Design and Efficiency
Sarah's Expert Insight
NBC Compliance Specialist • empcontracting.ca Inc.
"Part NECB 4 (Lighting) of the National Building Code establishes foundational requirements for NECB Part 4: Lighting Design and Efficiency. At empcontracting.ca Inc., we engineer every custom build and new customizable, full home build completed on site building construction package to meet or exceed these provisions."
4.1.1.1. Scope. This Part applies to the energy efficiency of lighting systems in commercial and industrial buildings.
4.2.1.1. Interior Lighting Power. The total interior lighting power shall not exceed the prescribed limits for the building type.
4.2.2.1. Lighting Controls. Automatic lighting controls, such as occupancy sensors and timers, shall be installed to minimize energy waste.
empcontracting.ca Inc. Mastery: We utilize 'DALI' and 'Zigbee' smart lighting controls to masterfully optimize energy use in our commercial projects.
Disclaimer: This technical summary is provided for educational and planning reference by empcontracting.ca Inc. Every new customizable, full home build completed on site building construction package (excluding lots and real estate) is engineered to comply with NBC and applicable provincial codes.