NBC Official Compliance Standard

Part NECB 4: NECB Part 4: Prescriptive Lighting Standards

S

Sarah's Expert Insight

NBC Compliance Specialist • empcontracting.ca Inc.

"Part NECB 4 (Lighting) of the National Building Code establishes foundational requirements for NECB Part 4: Prescriptive Lighting Standards. At empcontracting.ca Inc., we engineer every custom build and new customizable, full home build completed on site building construction package to meet or exceed these provisions."

4.2.1.1. Scope. This Section applies to the prescriptive requirements for interior and exterior lighting systems.

4.2.2.1. Lighting Power Density. The total installed interior lighting power shall not exceed the prescribed power density for the building type.

4.2.3.1. Controls. Automatic lighting controls, such as occupancy sensors and daylight harvesting, shall be provided where required.

empcontracting.ca Inc. Mastery: We utilize high-efficiency LED lighting and advanced control systems to masterfully exceed NECB lighting standards.

Disclaimer: This technical summary is provided for educational and planning reference by empcontracting.ca Inc. Every new customizable, full home build completed on site building construction package (excluding lots and real estate) is engineered to comply with NBC and applicable provincial codes.

Custom Concepts — Full Build Home Packages (Interiors & Exteriors) Completed by Us or for Qualified Professionals Custom Concepts for Full Build Home Packages in Canada • Contact Us for International Build Package Fulfillment (Excluding Lots & Real Estate)