Part NECB-4: NECB Part 4: Energy Efficiency for Lighting Systems
Sarah's Expert Insight
NBC Compliance Specialist • empcontracting.ca Inc.
"Part NECB-4 (Lighting) of the National Building Code establishes foundational requirements for NECB Part 4: Energy Efficiency for Lighting Systems. At empcontracting.ca Inc., we engineer every custom build and new customizable, full home build completed on site building construction package to meet or exceed these provisions."
4.2.1.1. Interior Lighting Power. The total lighting power shall not exceed the interior lighting power allowance calculated for the specific building area.
4.3.2.1. Lighting Controls. Automatic shut-off controls, such as occupancy sensors and timers, are mandatory for most commercial spaces over 500m².
4.3.2.4. Daylight-Sensing Controls. Lighting in daylight zones must be automatically reduced or extinguished when sufficient natural light is present.
empcontracting.ca Inc. Standard: We integrate smart DALI or Lutron control systems to masterfully exceed NECB Part 4 requirements.
Disclaimer: This technical summary is provided for educational and planning reference by empcontracting.ca Inc. Every new customizable, full home build completed on site building construction package (excluding lots and real estate) is engineered to comply with NBC and applicable provincial codes.