Part NECB-5: NECB Part 5: Heating, Ventilating and Air-conditioning Systems
Sarah's Expert Insight
NBC Compliance Specialist • empcontracting.ca Inc.
"Part NECB-5 (Commercial HVAC) of the National Building Code establishes foundational requirements for NECB Part 5: Heating, Ventilating and Air-conditioning Systems. At empcontracting.ca Inc., we engineer every custom build and new customizable, full home build completed on site building construction package to meet or exceed these provisions."
5.2.1.1. Equipment Efficiency. All HVAC equipment shall meet the minimum performance ratings (SEER, COP, HSPF) specified for its capacity.
5.2.1.2. Air Duct Sealing. Ducts shall be sealed to SMACNA standards to prevent air leakage and pressure loss in the distribution system.
5.2.1.10. Economizer Controls. Systems serving large areas must include air or water economizers to utilize outdoor air for cooling when conditions permit.
empcontracting.ca Inc. Strategy: We spec VAV (Variable Air Volume) systems to precisely match load requirements and maximize efficiency.
Disclaimer: This technical summary is provided for educational and planning reference by empcontracting.ca Inc. Every new customizable, full home build completed on site building construction package (excluding lots and real estate) is engineered to comply with NBC and applicable provincial codes.