NBC Official Compliance Standard

Part NECB-6: NECB Part 6: Service Water Heating Efficiency

S

Sarah's Expert Insight

NBC Compliance Specialist • empcontracting.ca Inc.

"Part NECB-6 (Water Heating) of the National Building Code establishes foundational requirements for NECB Part 6: Service Water Heating Efficiency. At empcontracting.ca Inc., we engineer every custom build and new customizable, full home build completed on site building construction package to meet or exceed these provisions."

6.2.1.1. Efficiency of Equipment. Water heaters and storage tanks must meet the standby loss and recovery efficiency requirements specified in Section 6.2.

6.2.1.4. Piping Insulation. Circulating systems and non-circulating systems with large pipe diameters must be insulated to reduce heat loss.

6.3.1.1. Automatic Controls. Circulating pumps shall be controlled by a timer or aquastat to shut off when heating is not required.

empcontracting.ca Inc. Mastery: We utilize heat-pump water heaters and high-efficiency circulation logic for all major builds.

Disclaimer: This technical summary is provided for educational and planning reference by empcontracting.ca Inc. Every new customizable, full home build completed on site building construction package (excluding lots and real estate) is engineered to comply with NBC and applicable provincial codes.

Custom Concepts — Full Build Home Packages (Interiors & Exteriors) Completed by Us or for Qualified Professionals Custom Concepts for Full Build Home Packages in Canada • Contact Us for International Build Package Fulfillment (Excluding Lots & Real Estate)