NBC Official Compliance Standard

Part NECB 6: NECB Part 6: Service Water Heating Systems

S

Sarah's Expert Insight

NBC Compliance Specialist • empcontracting.ca Inc.

"Part NECB 6 (Service Water Heating) of the National Building Code establishes foundational requirements for NECB Part 6: Service Water Heating Systems. At empcontracting.ca Inc., we engineer every custom build and new customizable, full home build completed on site building construction package to meet or exceed these provisions."

6.1.1.1. Scope. This Part applies to the energy efficiency of service water heating systems in commercial and industrial buildings.

6.2.1.1. Equipment Efficiency. Water heaters and storage tanks shall meet the minimum performance ratings for standby loss and recovery efficiency.

6.2.2.1. Piping Insulation. All hot water piping in circulating systems shall be insulated to the prescribed thickness to minimize heat loss.

empcontracting.ca Inc. Standard: We utilize heat-pump water heaters and high-efficiency circulation logic for all major commercial builds.

Disclaimer: This technical summary is provided for educational and planning reference by empcontracting.ca Inc. Every new customizable, full home build completed on site building construction package (excluding lots and real estate) is engineered to comply with NBC and applicable provincial codes.

Custom Concepts — Full Build Home Packages (Interiors & Exteriors) Completed by Us or for Qualified Professionals Custom Concepts for Full Build Home Packages in Canada • Contact Us for International Build Package Fulfillment (Excluding Lots & Real Estate)