empcontracting.ca Inc.

Ontario Building Code (OBC) Technical Repository

Ontario Building Code Hazard Index: Group F Division 3 Industrial Building Requirements

Ontario Building Code Hazard Index: Group F Division 3 Industrial Building Requirements
S

Sarah's Expert Insight

OBC Compliance Specialist

"Navigating Hazard Index ratings is crucial when converting industrial spaces in London, Oakville, or Muskoka, as these values dictate the level of fire safety upgrades required by the Ontario Building Code. At empcontracting.ca Inc. your construction contractor in London, Ontario, we specialize in evaluating these H.I. values to ensure your warehouse or power plant renovation remains compliant while optimizing project costs."

Understanding Hazard Index (H.I.) for Low Hazard Industrial Occupancies

When renovating or changing the use of an existing building in Ontario, Table 11.2.1.1.-N of the 2024 Ontario Building Code Compendium is essential for determining the Hazard Index (H.I.). This table specifically addresses Group F, Division 3 occupancies, which typically include low fire load environments such as warehouses, workshops, and power plants.

Hazard Index Ratings by Occupancy Type

The Hazard Index is a numerical value assigned based on the building size (Small, Medium, or Large) and the specific nature of the work conducted within. Common classifications include:

  • Factories & Warehouses (Low Fire Load): H.I. ranges from 2 (Small) to 4 (Large).
  • Power Plants: Rated higher, from 3 (Small) to 5 (Large).
  • Storage Garages & Freight Depots: Typically carry an H.I. of 2 to 4 depending on building area.
  • Public Heritage Buildings: Maintain a specific index of 3 for small and medium sizes.

Determining Building Size Categories

Building size for the purposes of Part 11 of the OBC is calculated based on building area and height:

  • Small: Up to 800 m² or 2 storeys.
  • Medium: Up to 1,200 m² or 4 storeys (or 600 m² / 3 storeys for Heritage buildings).
  • Large: Any area up to 6 storeys (not exceeding 18m in height).
  • High-Rise Considerations: Buildings exceeding 18m in height may result in an H.I. of 5, while those over 36m reach an H.I. of 6.

Professional Compliance with empcontracting.ca Inc.

Navigating the complexities of Part 11 renovations requires an expert eye. If you are planning a conversion or upgrade, empcontracting.ca Inc. your construction contractor in London, Ontario, provides the technical expertise to ensure your project meets all 2024 OBC Compendium requirements while maximizing the potential of your existing structure.

Disclaimer: This content is generated from the Ontario Building Code for educational purposes. Always consult with a licensed professional engineer or your local building department before starting any construction project in London, Ontario.

← Back to OBC Index