empcontracting.ca Inc.

Ontario Building Code (OBC) Technical Repository

OBC Guide: Navigating Stop Work Orders and Orders to Uncover in London, Ontario

OBC Guide: Navigating Stop Work Orders and Orders to Uncover in London, Ontario
S

Sarah's Expert Insight

OBC Compliance Specialist

"Failing to wait for the prescribed inspection period before closing in walls is one of the most expensive mistakes a homeowner can make in high-value markets like Oakville or Muskoka. At empcontracting.ca Inc. your construction contractor in London, Ontario, we ensure every inspection is documented and discharged, preventing the risk of 'Orders to Uncover' that can derail project budgets and lead to permanent red flags on your land title."

Understanding Building Code Compliance and Discharge

In the province of Ontario, adherence to the Building Code Act (BCA) is mandatory for any renovation or new construction project. According to section 3.2 and 3.3, once the requirements of a building order have been satisfied, the Chief Building Official (CBO) is required to register a certificate of discharge in the land registry office. This ensures the property title is cleared of any outstanding compliance issues, a critical step for property owners in London and surrounding areas.

The Risks of Section 13(6): Order to Uncover

One of the most disruptive actions an inspector can take is issuing an 'Order to Uncover' under section 13(6). If a portion of a building is enclosed before a required inspection has taken place, or if construction proceeded without a permit, the CBO may order the builder to uncover the work at their own expense.

When Can an Order to Uncover Be Issued?

  • Construction was covered contrary to a direct order.
  • Required notice for inspection was not provided to the CBO or inspector.
  • Work was enclosed before the prescribed inspection period elapsed.
  • The construction was performed without a valid building permit.

To avoid these costly setbacks, it is essential to work with a professional team like empcontracting.ca Inc. your construction contractor in London, Ontario, who understands the strict inspection timelines required by local municipalities.

Section 14: Stop Work Orders

If an order made under section 12 or 13 is not complied with within a reasonable timeframe, the CBO may issue a Stop Work Order (Section 14). This order remains effective from the moment it is posted on the construction site and can be registered in the land registry office. Once registered, any person acquiring an interest in the land is legally deemed to have been served with the order, which can significantly complicate real estate transactions in Oakville, Muskoka, or London.

Public Disclosure and Registration

Modern building departments may now make these orders available to the public via official websites. Ensuring your project remains in good standing is vital for maintaining the reputation and value of your property.

Disclaimer: This content is generated from the Ontario Building Code for educational purposes. Always consult with a licensed professional engineer or your local building department before starting any construction project in London, Ontario.

← Back to OBC Index