empcontracting.ca Inc.

Ontario Building Code (OBC) Technical Repository

Plumbing Fixture Compliance in London, Ontario: A Guide to 2024 OBC 7.2.2 Standards

Plumbing Fixture Compliance in London, Ontario: A Guide to 2024 OBC 7.2.2 Standards
S

Sarah's Expert Insight

OBC Compliance Specialist

"Ensuring compliance with OBC 7.2.2 is critical for both high-end residential builds in Muskoka and commercial developments in London to prevent water damage and maintain sanitation standards. As empcontracting.ca Inc. your construction contractor in London, Ontario, we find that the strict spacing and drainage requirements for multi-head showers are particularly vital for the luxury custom homes we manage in the Oakville area."

Navigating the 2024 Ontario Building Code (OBC) is essential for ensuring the safety and longevity of any renovation or new build. At empcontracting.ca Inc. your construction contractor in London, Ontario, we prioritize strict adherence to Section 7.2.2 to guarantee high-quality plumbing installations.

General Surface and Material Requirements

7.2.2.1. Surface Standards

Every plumbing fixture must feature a smooth, hard, and corrosion-resistant surface. This ensures that the fixture is free of flaws or blemishes that could harbor bacteria or interfere with effective cleaning and sanitation.

7.2.2.2. Conformance to Industry Standards

Fixtures must meet specific CSA and ASME standards based on their material composition:

  • Vitreous China: ASME A112.19.2 / CSA B45.1
  • Stainless Steel: ASME A112.19.3 / CSA B45.4
  • Plastic & Composite: CSA B45.5 / IAPMO Z124
  • Specialty Items: Hydromassage bathtubs and macerating toilet systems must comply with dedicated safety standards (CSA B45.10 and CSA B45.9).

Shower Installation and Drainage Rules

7.2.2.3. Structural Integrity and Layout

Shower receptors must be constructed to be completely watertight, preventing leaks into walls or subfloors. Key drainage regulations include:

  • Drain Capacity: A single shower drain can serve a maximum of 6 shower heads.
  • Water Flow Management: For multi-head installations, the floor must be sloped to prevent cross-flow between different shower areas.
  • Spacing: Adjacent shower heads in a battery must be spaced at least 750 mm apart to ensure user comfort and proper drainage.

Specialized Requirements for Public and Food Service Areas

7.2.2.4. Concealed Overflows

To maintain hygiene and prevent the buildup of organic matter, dishwashing sinks and food preparation sinks are strictly prohibited from having concealed overflows.

7.2.2.5. Public Washroom Specifications

For commercial projects in London, Ontario, public water closets (toilets) must be of the elongated type and equipped with open-front seats to meet provincial health and accessibility standards.

Disclaimer: This content is generated from the Ontario Building Code for educational purposes. Always consult with a licensed professional engineer or your local building department before starting any construction project in London, Ontario.

← Back to OBC Index